PRISM AI Safety Hub

Upper Macungie Township, Lehigh County

Cetronia Road data center

Withdrawn The applicant pulled it.

Status basis: The Upper Macungie zoning hearing board unanimously denied the similar use appeal at its May 27, 2026 hearing. No appeal was filed by the August 5, 2026 deadline, and Air Products confirmed in August that it would not pursue one. This one is over, and it is the clearest local evidence that a denial grounded in the ordinance can hold.

This record reviewed October 3, 2026. Status can change at a single meeting, so check the municipality's own notice before relying on it.

The facts

DeveloperAir Products
ApplicantAir Products
LandownerAir Products
Where7201 Hamilton Boulevard at Cetronia Road, 194 acres, the company's former headquarters
MunicipalityUpper Macungie Township, Lehigh County
Buildings3 as proposed
Size2.6 million total as proposed, with individual buildings from 435,600 to 1.23 million
Land194 acres
PowerNot published that we could find.
UtilityCould not confirm
CoolingCould not confirm

What the developer says

These figures come from No verified tax or jobs figures were published for this proposal in the coverage we found.. We have not seen them independently verified.

    What we could not find

    • The exact date the plan was abandoned.
    • Whether any successor use is planned for the 194 acre site.

    Who is organized

    Opposing: None we could identify. Supporting: None we could identify beyond the developer.

    How it got here

    How Project Atlas got here Amber marks the moments that changed the project.
    December 4, 2025Upper Macungie held a public hearing and adopted an interim data center ordinance, not retroactive to this application.2026Air Products did not appeal the zoning board decision, and abandoned the plan.

    Decision deadline: Not applicable.

    Sources

    1. PressAir Products abandons plan for data center at former Upper Macungie headquarters · Lehigh Valley Public Media
    2. Press2.6 million sq ft data center campus proposed in Pennsylvania · Data Center Dynamics

    The grid and the water right now

    Live, the grid this would plug into

    checking MWh

    Electricity demand right now across PJM, the grid operator for 13 states including Pennsylvania.

    Source: U.S. Energy Information Administration, hourly grid monitor. We use EIA rather than PJM's own feed because PJM does not permit republishing its data without a paid membership.

    Live, the creeks nearest the site

    • checking

    Streamflow in cubic feet per second.

    Source: U.S. Geological Survey. A gauge reading does not measure anyone's water use. It is the public baseline, so a claim about the water here can be checked against it over time.