Allen Township, Northampton County

Prologis warehouse conversion

Approved A municipal body has voted to approve it.

Status basis: Supervisors voted unanimously on March 24, 2026 to approve amended preliminary and final land development plans converting an existing warehouse into a data center. This is the clearest case in the Lehigh Valley of a data center project itself being approved, as opposed to a township adopting data center zoning rules.

This record reviewed October 3, 2026. Status can change at a single meeting, so check the municipality's own notice before relying on it.

The facts

DeveloperPrologis
ApplicantPrologis
LandownerPrologis
Where2500 Liberty Drive, off Route 329 near Savage Road, with Howertown Road to the east and a quarry lake to the south
MunicipalityAllen Township, Northampton County
Buildings1, an existing warehouse originally approved in 2016 and completed in 2023
SizeAbout 1,000,000
LandThe existing warehouse footprint. No new acreage figure was published that we could find. acres
PowerNo megawatt figure was published that we could find, and we could not confirm whether the utility is PPL or Met-Ed.
UtilityCould not confirm
CoolingClosed loop. Supervisors also required a rooftop solar feasibility study and noise studies before and after the conversion.

What the developer says

These figures come from No tax, jobs or investment figures for this project were published in the coverage we found, which is itself notable next to the figures published for other projects.. We have not seen them independently verified.

    What the officials found

    Every public body that has reviewed this, and what each one concluded. not by us and not by anyone campaigning on either side.

    Lehigh Valley Planning Commission

    Could align, with conditions

    WFMZ reported that the LVPC had a lot of questions about the proposal during regional review.

    What we could not find

    • Power draw in megawatts, and which utility serves it.
    • Tax revenue, jobs and investment figures.
    • Whether the rooftop solar study was completed and what it found.

    Who is organized

    Opposing: None we could identify. Supporting: None we could identify beyond the developer.

    How it got here

    How Project Atlas got here Amber marks the moments that changed the project.
    2016The warehouse was originally approved.2023The warehouse was completed.March 24, 2026Supervisors unanimously approved the conversion to a data center.May 7, 2026Supervisors began looking at adding data center as a defined use in the zoning ordinance, after the approval.

    Decision deadline: Already approved.

    Sources

    1. PressAllen Township approves 1-million-square-foot data center at Prologis warehouse · WFMZ · April 1, 2026
    2. PressAllen board OKs data center conversion request | Lehigh Valley Press · Lehigh Valley Press · April 1, 2026
    3. PressLVPC has a lot of questions about Allen Township data center proposal · WFMZ

    The grid and the water right now

    Live, the grid this would plug into

    checking MWh

    Electricity demand right now across PJM, the grid operator for 13 states including Pennsylvania.

    Source: U.S. Energy Information Administration, hourly grid monitor. We use EIA rather than PJM's own feed because PJM does not permit republishing its data without a paid membership.

    Live, the creeks nearest the site

    • checking

    Streamflow in cubic feet per second.

    Source: U.S. Geological Survey. A gauge reading does not measure anyone's water use. It is the public baseline, so a claim about the water here can be checked against it over time.